Re: GP150 lockdown project
Posted: Sat Apr 10, 2021 7:35 pm
I put the shiney stand on for the time being.
Then moved on to the headset. I tried to fit the gear change (expensive one from a well known Italian make). That didn’t go well. The handle part is out of plane with the housing part so when you twist it, one side grinds in to the handlebar. That will be going back.
I then moved on to the throttle side to encounter this:
At this point, I laughed and packed up for the day
Then moved on to the headset. I tried to fit the gear change (expensive one from a well known Italian make). That didn’t go well. The handle part is out of plane with the housing part so when you twist it, one side grinds in to the handlebar. That will be going back.
I then moved on to the throttle side to encounter this:
At this point, I laughed and packed up for the day